Access Road:
A new ~2,800-foot access road with full drainage, erosion control, and striping has been completed to provide primary ingress/egress to the site. The roadway includes curb and gutter, storm basins, and utility coordination with existing infrastructure.
Lift Station & Utility Infrastructure:
The new lift station site is complete and positioned to support wastewater service for the entire industrial development. Utility work included:
Installation of gravity sewer and force main infrastructure
Compliance with Hernando County Utilities Department specs (cover depths, pressure testing, tracer wire, warning tape)
Coordination with multiple utility providers, including Withlacoochee River Electric and AT&T
Stormwater Management:
Drainage features include over 10 stormwater basins and ~1,400 LF of reinforced concrete pipe (RCP) ranging from 18" to 24" in diameter, all engineered to control runoff within the development footprint.
Timeline:
The infrastructure improvements were completed in Q2 2025.
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.